INQUIRY FORM

LG Pipes and Tubes is located in Mumbai (India) and established in the year 1980. We accept all small and large quantity orders. We supply all materials with proper marking and Mill Test Certificate to assure the quality of products. Our team experts help you to choose the right material for high-temperature applications and you can easily track your orders.

Value Added Services

  • Bending
  • Cladding
  • Re Draw & Expansion
  • Forging
  • Hot Dip Galvanizing
  • Fabricate pipe & Fittings
  • Wall thickness calculation
  • Special packaging (export)
  • Neutral shipments to end customers
  • Express delivery
  • Parcel shipping
  • additional material testing
  • Surface treatment / corrosion protection
  • Drawing creation
  • mechanical preparation
  • CNC Machining
  • Polish ( Electro & Commercial )
  • Threading
  • mechanical preparation
  • Production also of small series

Inspection Facilities

Facilities Scale
Universal Testing Machine 40 Ton
Positive Material Identification -
Rockwell Hardness Tester 160 kgf
Brinell Hardness Tester 3100kgf
Portable Hardness Tester -
Ultrasonic Hardness Tester -
Surface Roughness Tester -
Magnetic Particle Tester -
Facilities Scale
Vernier Calipers 0-1000 milimeter
Digimatic Calipers 0-200 milimeter
Groove Gage(BX-1000, BXG-1000) -
Dial Height Gage 0-600milimeter
NPT Gage 1/8Inches-4Inches
G Gage 1/8Inches-2Inches
PF Gage 1/4Inches-1Inches

Manufacturing Equipments At Our Factory:

  • CNC Machining Equipment
  • Flange Forging Process
  • Large Size Lathe Machine
  • Lathe Machining For Flanges
  • Rolling Forging Machine
  • Flange Drilling Machine
  • CNC Drilling Machine
  • CNC Lathe Machine
  • CNC Machining Devices

Production facilities for Steel Pipes & Tubes

Mill Location Mumbai
Facility
  • Piercing Mill
  • Rotating Heat Furnace
  • Hot Rolling Mill
  • Tube Cutter
  • Beveling Machine
  • Hot Induction Bend
  • Extruding Machine
  • Heat Treatment
  • Furnace
  • Cutting and End Welder
  • Forming Machine
  • Leveling
Area 2900m2
Production Schedule
25 -45 days